AGP Picks
View all

Semplastics joins DOE-backed superhot geothermal project

9 hours ago
Semplastics joins DOE-backed superhot geothermal project
By AI, Created 14:40 UTC, Nov 18, 2026, AGP -

Semplastics will contribute ceramic insulation technology to a Blade Energy Partners-led project selected for DOE ARPA-E SUPERHOT award negotiations. The effort aims to improve well durability in superhot geothermal reservoirs and could help unlock more reliable baseload power from extreme underground heat.

Why it matters: - Superhot geothermal resources could deliver far more power from each well than conventional geothermal systems. - The project targets well materials that can survive extreme heat and pressure long enough for commercial use. - DOE says SUPERHOT could help deliver 10 to 20 gigawatts of baseload power by 2040.

What happened: - Semplastics said it will join a Blade Energy Partners, Ltd. project selected for award negotiations by the U.S. Department of Energy’s Advanced Research Projects Agency-Energy. - The project, "Enabling Robust SHR Well Design and Construction," will evaluate Semplastics’ ceramic foam as a thermal-insulating well liner for superhot geothermal reservoirs. - The announcement was made Nov. 18, 2026, from Oviedo, Florida.

The details: - Semplastics will develop and test a rigid, machinable zirconia-toughened alumina ceramic foam as a thermal-insulating liner. - The material is designed to combine very low thermal conductivity and low density with stability under rapid thermal shock. - DOE says SUPERHOT is designed to more than triple the output of individual geothermal wells. - The program targets geothermal resources above 375 degrees Celsius and 22 megapascals. - Blade Energy Partners will lead an integrated well system effort that includes new alloys, ceramic liners and advanced cements. - The team aims to maintain well integrity for more than 15 years. - The project is one of eight selected for up to a combined $30 million through ARPA-E’s SUPERHOT program.

Between the lines: - The project is focused on one of the biggest barriers to superhot geothermal development: keeping well infrastructure intact in environments hot enough to damage conventional materials. - Semplastics’ role suggests ceramic materials could help close the gap between lab promise and field durability. - If the liner works as intended, geothermal operators could get longer-lived wells with higher output, which would improve project economics.

What's next: - The partners will move through DOE award negotiations and project development. - Semplastics and Blade Energy Partners will validate the integrated well design for use in superhot reservoirs. - More information is available in ARPA-E’s announcement and on the SUPERHOT program page. - Semplastics also directs readers to semplastics.com and x-materials.com for company information.

The bottom line: - The project is a bet that advanced ceramics can help geothermal energy operate at extreme temperatures long enough to matter at utility scale.

Disclaimer: This article was produced by AGP Wire with the assistance of artificial intelligence based on original source content and has been refined to improve clarity, structure, and readability. This content is provided on an “as is” basis. While care has been taken in its preparation, it may contain inaccuracies or omissions, and readers should consult the original source and independently verify key information where appropriate. This content is for informational purposes only and does not constitute legal, financial, investment, or other professional advice.

Sign up for:

Power Generation Journal

The daily local news briefing you can trust. Every day. Subscribe now.

By signing up, you agree to our Terms & Conditions.

Share this page:

Advanced Search Options

Search for:

Search scope:

Type:

Search in:

Date range:

The last

Sort by:

Sign up for:

Power Generation Journal

The daily local news briefing you can trust. Every day. Subscribe now.

By signing up, you agree to our Terms & Conditions.